Engineering Service
Solutions for Maritime Terminals
With decades of experience and innovation, PACECO® CORP. can provide solutions for the increase of overall crane height and outreach allowing your terminal to accommodate ever-increasing ship sizes.
Modification work can be completed within twenty weeks after receiving purchase order with as little as four weeks time out of service for a boom extension or leg raise modification.
News
April, 2024 | Discussions on port cranes in the United States. read more..
For US port crane inquiries, please contact:
PACECO Cranes Sales Department
Tel: 510-264-9288
Email: usportcranes@pacecocorp.com
October, 2023 | The first Hydrogen powered battery electric RTG is in the final stages of production before deployment to Yusen terminal at the Port of Los Angeles. read more..
TOC Americas 2022 | Troy Collard, General Manager of Sales at PACECO, provides a brief explanation on the newly developed hydrogen powered RTG>>see video
September, 2022 | Four NZE (Near-Zero Emission) RTG Transtainer® cranes delivered by Mitsui E & S Machinery Co., Ltd. (MES) to the Japan Yusen Tokyo Container Terminal. read more…
Reliability
PACECO CORP. has performed numerous on-time Crane Modifications.
- Patented counterweight design
- Boom hoist system remains unchanged when the boom is extended.
- Waterside wheel load increases less than 5%.
- Multiple Jacking towers
- Internal Engineering
- Boom Extension without lowering the Boom.
Replacement Service
PACECO® CORP. can provide replacements for Structural, Mechanical and Electrical components.
Crane Condition Survey
PACECO® CORP. can dispatch a qualified engineer to perform a visual survey of critical structural and mechanical components and to review maintenance and repair records in order to determine service life.
Capacity Increase
Our engineering team can analyze existing cranes for the feasibility of increasing the rated load.
PACECO Genuine Parts
PACECO® CORP. can provide replacements for Structural, Mechanical and Electrical components.
News
PACECO GROUP achieves a new milestone on the path towards port decarbonization.
Hydrogen Fuel Cell Development
Decarbonizing port operations has become an absolute priority on the road towards an overall ecological transition.....